PASE-A

Production Facilities & Operation Supporting Facilities

  • PASE-A three phase Separator built in 1997 with maximum gas production capacity 110 MMSCFD
  • PASE-A facilities connected to three producing wells (A-1, A-5 and A-6)
  • Produced Gas from PASE-A is transfered to PHE-NSB facilities as a Rich Gas using 12” pipeline
  • Commingled Production Gas between TPI and PHE-NSB would be boosted to PAG Gas Processing Plant before commercialized
  • Operation Supporting Facilities such as CCR, Offices, Camps & Dining Hall are placed at PASE-A facilities as our central operation area

PASE-B

Production Facilities & Operation Supporting Facilities

  • PASE-B well site situated about 12.4 km from PASE-A facility
  • PASE-B facility have 1 production well (A-8), Equipment, Security and MCC Building.
  • PASE-B production transferred to Cluster SLS-D using 16” pipeline ( 5.7 km )
  • 1 potential well (BP-1) is planned to be drilled at PASE-B area.

CLUSTER SLS-D

Production Facilities & Operation Supporting Facilities

  • Cluster SLS-D built in 2003 to support production of PASE-B with maximum production capacity 120 MMSCFD
  • Cluster SLS-D facility has Slug Catcher and Blowdown Vessel, 3 Streams Metering System, ESD System and supporting equipment
  • Produced Gas from Cluster SLS-D is transferred to Cluster SLS-A Separator Plant (PHE-NSB Facility) and then the commingled gas is transferred to PAG Gas Processing Facility.